Bit of an update for those interested, the chassis components are pretty much done, all the centre hub stuffs done as well, Ill post some pics soon, I will probably be making a start on the tank etc, the week after next.
As stated earlier I want to run the early ECU and electrics so today I've managed (with the help of Tash's puller "thanks" and no heat required!! ) to get the rotors swapped over from the Gen I engine to the Gen II, luckily the sprag on the spare Gen1 engine was new so I just installed it as is, I also modified the head and cam cover on the Gen II to take the older cam pickup sensor and wires' Tomorrow I can machine the inside face of the main chassis rails just to get some weight out of em, calculated all up weight is now looking like 160ish kg, better than I thought when I started the project, my target being 180, so this coming week I can get started on putting the bike together proper, oh ye both swinging arms are completed I just need to get them powder coated along with the wheels, don't get me wrong its no where near finished, I still have a lot of components to make but I can see light now............
pics soon...
Anyone have a drawing of the locking tool, I need to change the exhaust cam sprocket or is it easy to do I havent checked the manual yet